- Status
- Year
- Location
- Completed
- 2022
- Greystanes
Holroyd High School Library Upgrade was an exciting and challenging project. The project was driven by strong sustainable values, which led to the preservation of most of the existing building fabric and structure. The existing roof had frequent rain leaks and a new roof design was proposed. A new elevated clerestory was introduced to provide natural light to the centre of the building, given its large square footprint.
Photo Gallery
Previous
Next