Holroyd High School – Library

Holroyd High School – Library

The upgrade of Holroyd High School Library presented an exhilarating challenge for Topsteel Solutions, perfectly aligning with our commitment to sustainable and innovative construction. Central to this project was the preservation of the existing building structure, where our steel framing played a pivotal role.

Our advanced steel framing facilitated the redesign of the library’s roof, effectively addressing the issue of rain leaks. The introduction of a new, elevated clerestory, crafted with precision steel framing, brought a flood of natural light to the heart of the building, despite its expansive square footprint.

Photo Gallery